{"id":250552,"date":"2024-08-08T11:30:23","date_gmt":"2024-08-08T09:30:23","guid":{"rendered":"https:\/\/austermann-pmp.com\/item\/process-engineering\/"},"modified":"2024-12-13T13:53:30","modified_gmt":"2024-12-13T12:53:30","slug":"process-engineering","status":"publish","type":"project","link":"https:\/\/austermann-pmp.com\/en\/item\/process-engineering\/","title":{"rendered":"Process engineering"},"content":{"rendered":"<h5>Focus<\/h5>\n<p>Industrialization of new products and technologies, capacity expansion, localization<\/p>\n<p>&nbsp;<\/p>\n<h5>Procedure<\/h5>\n<ul>\n<li><strong>Scope and kick-off<\/strong><br \/>\nLimitation of the scope of services in terms of product range, maturity level, technologies, capacities, target costs (CapEx\/OpEx), depth of added value, timeline, modular expandability and kick-off execution<\/li>\n<\/ul>\n<ul>\n<li><strong>Planning status and initial data analysis<\/strong><br \/>\nCurrent status of the industrialization concept, existing specifications, customer perspective, scenarios, options for re-use of existing structures, initial cost estimate, milestones and conflicting objectives<\/li>\n<\/ul>\n<ul>\n<li><strong>Ability to integrate into existing production system<\/strong><br \/>\nAnalysis of existing processes and comparison of integration potential with regard to transfer processes, expandability and interaction with current capacity requirements<\/li>\n<\/ul>\n<ul>\n<li><strong>Adaptation of concept and specifications<\/strong><br \/>\nCritical comparison and supplementation of requirements, concepts, assumptions and premises as well as agreed draft decision as a clear picture for achieving objectives and minimizing risks<\/li>\n<\/ul>\n<ul>\n<li><strong>Planning of industrialization<\/strong><br \/>\nDetailing of concepts and material flow, designing systems and processes, options for capacity expansions and optimizations, simulation and stress test as well as step-by-step evaluation of the current plans<\/li>\n<\/ul>\n<ul>\n<li><strong>Equipment suppliers<\/strong><br \/>\nPreparation of performance and requirement specifications as well as technical and commercial evaluation in the tendering process<\/li>\n<\/ul>\n<ul>\n<li><strong>Installation and integration of production systems<\/strong><br \/>\nUpdating scheduling, milestones and buffer times, coordination of pre-acceptance at the supplier, on-site installation, performance tests, rework, final acceptance, complaint and change management<\/li>\n<\/ul>\n<ul>\n<li><strong>Project monitoring<\/strong><br \/>\nTracking of target achievement in terms of deadlines, costs, maturity, quality including risk monitoring and coordinated internal\/ external reporting<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<h5>Result<\/h5>\n<p>Transparent, on-time and cost-optimized industrialization<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Focus Industrialization of new products and technologies, capacity expansion, localization &nbsp; Procedure Scope and kick-off Limitation of the scope of services in terms of product range, maturity level, technologies, capacities, target costs (CapEx\/OpEx), depth of added value, timeline, modular expandability and kick-off execution Planning status and initial data analysis Current status of the industrialization concept, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":249999,"comment_status":"open","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"project_category":[43],"project_tag":[],"class_list":["post-250552","project","type-project","status-publish","has-post-thumbnail","hentry","project_category-offer"],"acf":[],"_links":{"self":[{"href":"https:\/\/austermann-pmp.com\/en\/wp-json\/wp\/v2\/project\/250552","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/austermann-pmp.com\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/austermann-pmp.com\/en\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/austermann-pmp.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/austermann-pmp.com\/en\/wp-json\/wp\/v2\/comments?post=250552"}],"version-history":[{"count":0,"href":"https:\/\/austermann-pmp.com\/en\/wp-json\/wp\/v2\/project\/250552\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/austermann-pmp.com\/en\/wp-json\/wp\/v2\/media\/249999"}],"wp:attachment":[{"href":"https:\/\/austermann-pmp.com\/en\/wp-json\/wp\/v2\/media?parent=250552"}],"wp:term":[{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/austermann-pmp.com\/en\/wp-json\/wp\/v2\/project_category?post=250552"},{"taxonomy":"project_tag","embeddable":true,"href":"https:\/\/austermann-pmp.com\/en\/wp-json\/wp\/v2\/project_tag?post=250552"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}