{"id":250256,"date":"2024-08-08T11:32:05","date_gmt":"2024-08-08T09:32:05","guid":{"rendered":"https:\/\/austermann-pmp.com\/item\/design-for-manufacturing\/"},"modified":"2024-12-13T13:37:17","modified_gmt":"2024-12-13T12:37:17","slug":"design-for-manufacturing","status":"publish","type":"project","link":"https:\/\/austermann-pmp.com\/en\/item\/design-for-manufacturing\/","title":{"rendered":"Design for manufacturing"},"content":{"rendered":"<h5>Focus<\/h5>\n<p>Production-oriented product design as a platform strategy including model and country variants<\/p>\n<p>&nbsp;<\/p>\n<h5>Procedure<\/h5>\n<ul>\n<li><strong>Scope and kick-off<br \/>\n<\/strong>Coordination of target system, measurability, milestones, project structure and interfaces<\/li>\n<\/ul>\n<ul>\n<li><strong>Development status and initial data analysis<br \/>\n<\/strong>Current design status, existing specifications, concept approaches and conflicting objectives<\/li>\n<\/ul>\n<ul>\n<li><strong>Analysis of current product and production system<br \/>\n<\/strong>Evaluation of production network including process landscape and technologies as well as structural focus topics, problems and potentials<\/li>\n<\/ul>\n<ul>\n<li><strong>Adjustment of targets and concept approaches<br \/>\n<\/strong>Comparison and revision based on the findings out of the plant analysis of the production network<\/li>\n<\/ul>\n<ul>\n<li><strong>Prioritization of key topics<br \/>\n<\/strong>Identification and chronological order of critical topics, coordination of work packages in the project and input in the milestone plan<\/li>\n<\/ul>\n<ul>\n<li><strong>Working on key topics<br \/>\n<\/strong>Joint development of concepts to solve critical issues in cross-functional teams accompanied by detailed monitoring of the respective work packages<\/li>\n<\/ul>\n<ul>\n<li><strong>Resolution of conflicting objectives<br \/>\n<\/strong>Identification of problem areas due to competing requirements\/ interfaces and joint development of optimized overall solutions<\/li>\n<\/ul>\n<ul>\n<li><strong>Overall project monitoring<br \/>\n<\/strong>Support for central project controlling through neutral evaluation of the project status and identification of potential problem areas as an active early warning system<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<h5>Result<\/h5>\n<p>Optimized product design in terms of manufacturing cost, quality, weight, integration capability, investment requirements, warranty and CO2 footprint<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Focus Production-oriented product design as a platform strategy including model and country variants &nbsp; Procedure Scope and kick-off Coordination of target system, measurability, milestones, project structure and interfaces Development status and initial data analysis Current design status, existing specifications, concept approaches and conflicting objectives Analysis of current product and production system Evaluation of production network [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":250011,"comment_status":"open","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"project_category":[43],"project_tag":[],"class_list":["post-250256","project","type-project","status-publish","has-post-thumbnail","hentry","project_category-offer"],"acf":[],"_links":{"self":[{"href":"https:\/\/austermann-pmp.com\/en\/wp-json\/wp\/v2\/project\/250256","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/austermann-pmp.com\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/austermann-pmp.com\/en\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/austermann-pmp.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/austermann-pmp.com\/en\/wp-json\/wp\/v2\/comments?post=250256"}],"version-history":[{"count":0,"href":"https:\/\/austermann-pmp.com\/en\/wp-json\/wp\/v2\/project\/250256\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/austermann-pmp.com\/en\/wp-json\/wp\/v2\/media\/250011"}],"wp:attachment":[{"href":"https:\/\/austermann-pmp.com\/en\/wp-json\/wp\/v2\/media?parent=250256"}],"wp:term":[{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/austermann-pmp.com\/en\/wp-json\/wp\/v2\/project_category?post=250256"},{"taxonomy":"project_tag","embeddable":true,"href":"https:\/\/austermann-pmp.com\/en\/wp-json\/wp\/v2\/project_tag?post=250256"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}